Renewable energy in construction
IAT industry area: |
Construction |
Signature discipline: |
Sustainability |
Micro Credential/Micro Skill title: |
Renewable Energy in Construction |
Expected duration (hours): |
50 hours |
|
TAFE |
Assessment Release Date/Week: |
|
Assessment Due Date: |
|
Submission Details: |
|
Contact: |
|
Learning Outcomes |
Details |
Understand the basic principles of renewable energy and its relevance to the construction industry. |
Task 1 |
Compare different types of renewable energy sources suitable for construction projects. |
Tasks 2 and 3 |
Respond to challenges and limitations to integrating renewable energy sources in construction operations. |
Tasks 4 and 5 |
Analyse factors driving the adoption of renewable energy in construction. |
Task 6 |
Apply knowledge to select suitable renewable energy sources for real-world construction projects. |
Task 7 |
Measure the impact of renewable energy on reducing on-site emissions. |
Tasks 7 and 8 |
Section Heading |
Details |
Project Outline |
The project tasks aim to support learners towards application of renewable energy systems into construction projects. Learners are asked to function as a Project Manager to investigate the potential use of renewable energy sources as a way of reducing carbon emissions, for the construction of a new factory.
|
Project Components
|
|
RB Holdings Constructions is a company committed to being a leader in the construction industry. Sustainability is a core operating principle, and as part of their sustainability policy, projects are required to reduce resource consumption, including water and energy use, wherever practicable.
As an RB Holdings project manager, you must investigate the potential use of renewable energy sources to action this commitment to sustainable practice and reduce on-site carbon emissions. All project tasks should be completed regarding this project.
Research and identify two (2) renewable energy sources suitable for use in the Australian construction industry. One (1) source should relate to the temporary energy sources (the construction delivery phase) and one (1) source should relate to the permanent infrastructure. Create a summary of your research findings. This should be up to 500 words in length. In the summary, you should:
Complete a cost analysis for introducing solar light towers on-site during the construction period. This will be up to 500 words in length and include:
You may create hypothetical costings relevant to the selected renewable energy sources (for example initial capital investment cost, operational life, energy output). The market prices for other renewable energy sources have been provided to assist with calculations:
Write a short summary comparing the identified renewable energy sources and select one (1) resource for use in the factory project (this could be a temporary or permanent source). Compare the renewable energy resources by using a multi-criteria assessment. This should be up to 500 words in length where you must:
You can use a table like the example below to compare your selected renewable energy sources. By adding the assessment criteria for each source, you can then analyse which is most effective.
Table 1 -Renewable energy assessment table
# |
Criteria |
[Renewable energy 1 type/name] |
[Renewable energy 2 type/name] |
1 |
|
|
|
2 |
|
|
|
3 |
|
|
|
4 |
|
|
|
Write a short summary Identifying a minimum of two (2) barriers to implementing the chosen renewable energy resource on the project. This should be up to 500 words in length and you should:
Develop at least two (2) strategies to overcome the identified barrier to implementing the chosen energy source (A total of four (4) strategies. This should be up to 500 words in length where you must:
Write a short summary describing how the chosen renewable energy sources align to the drivers for renewable energy adoption in the Australian construction industry. This should be up to 500 words in length where you must:
Design a strategy for implementing the chosen renewable energy source. This should be up to 800 words in length and include:
Develop a strategy to measure the impact of the chosen renewable energy sources on reducing carbon emissions. This should be up to 500 words in length and include:
*Add more than one task if required in the above format
Summarise theory and practical learnings using oral and written communication strategies, this should include:
This project will be graded as complete/ not yet complete relevant to the following criteria;
Submission Component |
Details of criteria |
Task 1 |
Identification of one (1) renewable energy source related to the temporary energy sources (the construction delivery phase) Identification of one (1) renewable energy source related to permanent infrastructure on a construction site. Explanation of the purpose of utilising renewable energy source in the construction industry Description of how the selected renewable energy sources work and two (2) key components of each Evaluation of the practicality of each source in relation to which part of the construction phase it is being introduced. Analysis of the benefits and limitations of using each renewable energy source with respect to cost savings, reductions in carbon emissions and potential logistical challenges Comparison and summary of at least two (2) advantages of each source to traditional fossil fuels or other energy sources commonly used in construction. |
Task 2 |
Calculation of the return on investment (ROI) for each of the selected renewable energy sources Calculation of the payback period for the selected sources Short discussion on the implications of the cost analysis findings on decision-making for renewable energy deployment |
Task 3 |
Defining four (4) criteria for assessing the feasibility of renewable energy sources. Application of the criteria to assess each renewable energy source utilising data and research findings from previous tasks. Analysis of the effectiveness of each renewable source based on the selected criteria Identification of the most suitable renewable energy source for the factory construction project A suggested response would consider the following: Learners may choose to compare solar panels and wind turbines. |
Task 4 |
Identification of two (2) barriers relevant to the project that may hinder the implementation of the selected renewable energy resource Discussion of the implications of the barriers on the feasibility and practicality of integrating the selected renewable energy sources |
Task 5 |
Development of at least two (2) strategies to overcome each of the identified barriers to implementation of the chosen energy source (A total of four (4) strategies. Evaluation of the feasibility and effectiveness of potential solutions or strategies for overcoming each barrier with consideration to its impact on construction operations and adoption of renewable energy sources on-site. Prioritisation of the identified barriers based on their significance and potential impact in hindering the implementation of renewable energy sources. Description of at least two (2) strategies for overcoming each barrier, ensuring a total of four strategies are provided. Explanation of the rationale for selecting each of the strategies, including any evidence from research conducted as part of the task. Articulation of clear step-by-step plans for how each strategy would be implemented, including resources, timelines and the stakeholders involved |
Task 6 |
Identification of at least three (3) key drivers for the adoption of renewable energy in the Australian construction industry Explanation of how each driver influences the adoption of renewable energy in the construction sector |
Task 7 |
Calculation of daily energy demands Determination of the viability of using the chosen source against criteria including cost effectiveness, environmental impact and one (1) additional criterion of learner's choice Development of a plan for the implementation and operation of the chosen renewable energy source Identification of three (3) potential risks and associated controls Identification of two (2) regulatory requirements Identification of two (2) relevant stakeholder groups Identification of at least one (1) method to successfully engage with each of them. |
Task 8 |
Identification and description of two (2) scope 1 emission sources on site, and one (1) scope 3 emissions source. Development of three (3) SMART key performance indicators (KPIs) and one (1) metric for each KPI (a total of three (3) metrics) Identification of three (3) different types of data that could be gathered to measure the impact of renewable energy sources in reducing carbon emissions |
Task 9 |
Delivery of a five (5) minute presentation outlining theory and practical learnings throughout the micro-credential Creation of PPT of six (6) to ten (10) slides to support the presentation Use of Teams or Zoom to present and record the presentation Producing a strategy document summarising learnings |
Place your order to get best research help